A: This section of roadway was built as a 4-lane divided highway in the 1950s. We held a number of design meetings to get public feedback on improvements in 2016 and 2017.
This stretch of roadway is very congested, particularly during weekday travel times. Traffic from adjoining streets has difficulty accessing US 70 North Main Street.
We have secured funding to add another lane in each direction to improve traffic flow and safety as well as build box culverts at the bridge crossing the Alameda Trail to improve storm drainage. By adding a new traffic signal at the US 70 Main Street intersection with Elks Drive and North Triviz Drive, we can link that signal with our current system to better time the light. Finally, we are installing ADA-compliant sidewalks for better pedestrian access.